Pioneer Growers
Pioneer Growers Cooperative, design/build, Edwards Construction, Belle Glade, Florida, Demolish 80% of the original 1955 packing house and rebuild over three phases. Phase 1 – a […]
Pioneer Growers Cooperative, design/build, Edwards Construction, Belle Glade, Florida, Demolish 80% of the original 1955 packing house and rebuild over three phases. Phase 1 – a […]
HHC designed the expansion for the existing JJ Taylor Distribution in Fort Myers, Florida. The project included a new 38′ clear, 135,000 sf warehouse, 10,000 […]
JBT Food Tech in Lakeland, Florida consists of the complete tear down of a pre-World War II manufacturing plant along with office and smaller out […]
A new 50,000 SF+/- facility for processing dough for distribution to regional retail outlets; also distributed other food and foodservice products from this facility; also […]
105,000 SF insulated tilt-wall, refrigerated vegetable processing facility for Green Beans, Radishes, Corn, Parsley & other vegetables; includes operations from unloading field trucks to completed […]
134,000 SF expansion project included 42,000 SF of two-story Class ‘A’ Corporate Offices and 88,500 SF of insulated tilt-wall, refrigerated hi-bay cold storage for vegetables, […]
The 16,000 SF addition to the existing Yuengling Tampa brewery includes all-new brewing equipment and operations that the building expansion was designed around. The new […]
The Publix expansion in Lakeland, Florida, is 40′-0″ clear to steel, 550,000 sq. ft. It is a tilt wall, conventionally framed cross dock distribution warehouse […]
Pioneer Growers Cooperative, design/build, Edwards Construction, Belle Glade, Florida Initially a 120,000 SF +/- vegetable processing facility (corn, green beans & radishes), reduced to a […]